Construction of Desalinated Water Pipeline in Rafah and Khan Younis
-
CategoryEmergency
-
ClientFares SHAHM
-
Supervisor-
-
Funded By-
-
RegionSouthern Governorate
-
From - To2025-07-24 - 2025-09-10
-
Value1,450,205.00$
Excavation works and installs HDPE 450MM AND 350 MM pipeline extending from the desalination plant located in Rafah, Egypt to the Al-Mawasi area with total length 6,765 meters. Additionally, several water distribution points equipped with water tanks and filling stations will be installed to ensure displaced families have reliable access to clean water for their daily needs