Beit Lahia Seawater RO (SWRO) Desalination Plant

  • Category
    Desalination Plants
  • Client
    Palestinian Water Authority (PWA)
  • Supervisor
    Degrémont
  • Funded By
    AFD
  • Region
    Beit Lahia
  • From - To
    2000-01-01 00:00:00 - 2001-01-01 00:00:00
  • Value
    570,000.00$

The works include all civil works and electromechanical installation for the desalination plant with a capacity of 5,000 m³/day
MACC was a subcontractor to Degrémont, which was the prime contractor
The project is considered the first SWRO desalination technology in Gaza and included civil works: beach well digging, sand filter installation, RO building construction (steel structure building), post-treatment, retaining wall of the whole site, about 7,000 m² area