Gaza Central Wastewater Project - Reconstruction ProgrammeER6-2 Reconstruction of Water Network

  • Category
    WATER / WASTEWATER NETWORKS
  • Client
    CMWU
  • Supervisor
    DORSCH INTERNATIONAL CONSULTANTS GMBH
  • Funded By
    KFW
  • Region
    Wastewater
  • From - To
    2015-06-15 00:00:00 - 2017-01-18 00:00:00
  • Value
    781,895.00$

Supply and installation of about 22,000 LM UPVC pipes of different diameters (110mm. 225mm, 315mm), and 4,000 LM M.D.P.E with all needed fittings, valves (up to 16"), manholes.