Pressure Sewage Line – Sheikh Radwan Area
-
CategoryCONVEYANCE LINES
-
ClientMUNICIPALITY OF GAZA
-
Supervisor-
-
Funded By-
-
Regionمدينة غزة
-
From - To1998-01-01 00:00:00 - 1999-01-01 00:00:00
-
Value750,000.00$
A pumping station was at the end of Alsheikh Ridwan basin to convey from the basin to the sea in semi straight line