C4: solar PV for the Buriej and Sheikh Ajleen treatment plants

Design-build, supply and installation, with 3 years of O&M, of a 4.7 MW grid-tied PV system distributed across two sites (Al Buriej 3.5 MW, Sheikh Ajleen 1.2 MW), plus synchronization works between the PV system and the two diesel generators already installed at each site separately. The surplus power will be sold back to GEDCO.