Design and Construction of RO 14,000 m³/day of desalinated water, including main steel structure building with total area of 1,500 m² including all electro- mechanical works, 3 tanks with total capacity of 1,450m³, installation of 3 Km of HDPE piping works and 250 kw PV system.