1.306 MW PV grid-tied system, synchronization works between the PV system and the already installed 3 Diesel Generator at each site separately, Surplus power will be sold back to GEDCO.
MACC finishes 100% of Salfeet WWTP Civil Works
MACC Contract 4 and starts Operation and Maintenance Phase Contract 4: Bureij WWTP 3.5 MWp PV Plant