Construction of Solar Energy System for Khan- Younis WWTP
-
CategoryBUILDING/SUPER STRUCTURE
-
ClientEU
-
SupervisorABB
-
Funded ByPV Solar Project
-
RegionSouthern Governor ate
-
From - To2021-04-14 00:00:00 - 2023-05-17 00:00:00
-
Value1,525,252.00$
1.306 MW PV grid-tied system, synchronization works between the PV system and the already installed 3 Diesel Generator at each site separately, Surplus power will be sold back to GEDCO.