C6 – Sheikh Ajleen WWTP Measures (Gaza Central Water and Wastewater Project, Contract 6)
-
CategoryWastewater Treatment Plants
-
ClientCoastal Municipalities Water Utility (CMWU)
-
SupervisorCMWU
-
Funded ByKfW
-
RegionGaza City
-
From - To2018-03-04 00:00:00 - 2019-09-08 00:00:00
-
Value999,000.00$
Upgrading and protection works at the Sheikh Ajleen (Gaza Central) Wastewater Treatment Plant for CMWU under the KfW-funded Gaza Central Water and Wastewater Project. MACC was the main contractor; contract value EUR 908,196.
MACC's scope
- Reinforced-concrete boundary beams around treatment ponds 1 and 2, and repairs to stairs and landings
- DN1000 bypass line (70 m) allowing ponds 3 and 4 to be bypassed
- Repair of up to 100 m of the 20-inch treated-effluent sea outfall line
- Drying-beds operators' room and a new CMWU operations and store building
- 600 kVA supplementary diesel generator and 30 pole-mounted site lights