Gaza Central Water and Wastewater Project Contract 4 Buriaji and Sheikh Ajleen WWTPs Solar PVs with 3 years O&M.
-
CategoryTREATMENT PLANTS
-
ClientKFW
-
SupervisorCMWU
-
Funded ByKFW
-
RegionSOUTHERN GOVERNORATE / DURAJI
-
From - To2019-03-23 00:00:00 - 2023-08-20 00:00:00
-
Value5,067,231.00$
Design/Built,Supply & installation and 3 years O&M of 4.7 MW PV grid-tied system, distributed in two sites (ALBURIEJ 3.5 MW, SHIEKH AJLEEN 1.2 MW)+synchronization works between the PV system and the already installed two Diesel Generator at each site separately. The surplus power will be sold back to GEDCO.